Dre Dev Tools
Tools › Concrete
Free concrete tool

Concrete slab calculator

Cubic yards, bags and rebar for a slab of any size, with waste and the ready-mix order rounded to the quarter yard.

Quick answer: cubic yards = length × width × thickness in feet ÷ 27. A 10 × 10 ft slab 4 in thick is 1.23 yards, a 20 × 20 is 4.94 and a 30 × 40 is 14.81, before waste. One cubic yard is 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb.

Concrete, with the extra
–
In cubic feet–
Ready-mix order (next ¼ yd)–
80 lb bags–
60 lb bags–
40 lb bags–
Rebar grid–

Thickness, reinforcement and bar spacing come from your plans, engineer or building department. This sizes the order.

Slab sizes and worked examples

Concrete by slab size

SlabArea4 in thick, with 10 % extraReady-mix order80 lb bags6 in thick, with 10 % extra#4 rebar at 16 in, 20 ft sticks
10 × 10 ft100 sq ft1.36 cu yd1.5 cu yd622.04 cu yd10 sticks
10 × 12 ft120 sq ft1.63 cu yd1.75 cu yd742.44 cu yd14 sticks
10 × 20 ft200 sq ft2.72 cu yd2.75 cu yd1234.07 cu yd17 sticks
12 × 12 ft144 sq ft1.96 cu yd2 cu yd882.93 cu yd20 sticks
12 × 16 ft192 sq ft2.61 cu yd2.75 cu yd1183.91 cu yd23 sticks
12 × 20 ft240 sq ft3.26 cu yd3.5 cu yd1474.89 cu yd26 sticks
12 × 24 ft288 sq ft3.91 cu yd4 cu yd1765.87 cu yd33 sticks
14 × 20 ft280 sq ft3.80 cu yd4 cu yd1725.70 cu yd28 sticks
16 × 16 ft256 sq ft3.48 cu yd3.5 cu yd1575.21 cu yd26 sticks
16 × 20 ft320 sq ft4.35 cu yd4.5 cu yd1966.52 cu yd29 sticks
16 × 24 ft384 sq ft5.21 cu yd5.25 cu yd2357.82 cu yd37 sticks
18 × 20 ft360 sq ft4.89 cu yd5 cu yd2207.33 cu yd31 sticks
20 × 20 ft400 sq ft5.43 cu yd5.5 cu yd2458.15 cu yd32 sticks
20 × 24 ft480 sq ft6.52 cu yd6.75 cu yd2949.78 cu yd41 sticks
20 × 30 ft600 sq ft8.15 cu yd8.25 cu yd36712.22 cu yd56 sticks
20 × 40 ft800 sq ft10.86 cu yd11 cu yd48916.30 cu yd66 sticks
24 × 24 ft576 sq ft7.82 cu yd8 cu yd35211.73 cu yd52 sticks
24 × 30 ft720 sq ft9.78 cu yd10 cu yd44014.67 cu yd70 sticks
24 × 36 ft864 sq ft11.73 cu yd11.75 cu yd52817.60 cu yd76 sticks
24 × 40 ft960 sq ft13.04 cu yd13.25 cu yd58719.56 cu yd83 sticks
30 × 30 ft900 sq ft12.22 cu yd12.25 cu yd55018.33 cu yd96 sticks
30 × 40 ft1,200 sq ft16.30 cu yd16.5 cu yd73424.44 cu yd114 sticks
30 × 50 ft1,500 sq ft20.37 cu yd20.5 cu yd91730.56 cu yd150 sticks
30 × 60 ft1,800 sq ft24.44 cu yd24.5 cu yd1,10036.67 cu yd170 sticks
40 × 40 ft1,600 sq ft21.73 cu yd21.75 cu yd97832.59 cu yd134 sticks
40 × 50 ft2,000 sq ft27.16 cu yd27.25 cu yd1,22340.74 cu yd177 sticks
40 × 60 ft2,400 sq ft32.59 cu yd32.75 cu yd1,46748.89 cu yd200 sticks
40 × 80 ft3,200 sq ft43.46 cu yd43.5 cu yd1,95665.19 cu yd266 sticks
50 × 100 ft5,000 sq ft67.90 cu yd68 cu yd3,056101.85 cu yd443 sticks
60 × 100 ft6,000 sq ft81.48 cu yd81.5 cu yd3,667122.22 cu yd500 sticks

Source: volume is length × width × thickness plus 10 %; bag counts use QUIKRETE Concrete Mix No. 1101 data sheet: an 80 lb bag yields about 0.60 cu ft, 60 lb 0.45 cu ft, 40 lb 0.30 cu ft. Checked 12 November 2026. Tap a size to load it into the calculator, then change the thickness, the extra or the bar spacing there. The rebar column is a grid 3 in clear of the edges; the spacing is an example, your plans set it.

Concrete per 100 sq ft of slab, by thickness

ThicknessExact volumeWith 10 % extra80 lb bags, with the extraOne cubic yard covers
4 in1.23 cu yd1.36 cu yd6281 sq ft
5 in1.54 cu yd1.70 cu yd7765 sq ft
6 in1.85 cu yd2.04 cu yd9254 sq ft
8 in2.47 cu yd2.72 cu yd12340 sq ft

Source: volume is area × thickness; bag counts use QUIKRETE Concrete Mix No. 1101 data sheet: an 80 lb bag yields about 0.60 cu ft, 60 lb 0.45 cu ft, 40 lb 0.30 cu ft. Checked 12 November 2026. For a size that is not in the table above, multiply the row by the slab's area ÷ 100.

Bags per cubic yard

BagYieldBags per cubic yard
80 lb0.60 cu ft45
60 lb0.45 cu ft60
40 lb0.30 cu ft90

Source: QUIKRETE Concrete Mix No. 1101 data sheet: an 80 lb bag yields about 0.60 cu ft, 60 lb 0.45 cu ft, 40 lb 0.30 cu ft. Checked 12 November 2026.

Worked example: a 12 × 12 ft patio slab, 4 in thick, from bags or a truck

  1. Volume: 12 × 12 × (4 ÷ 12) = 48 cu ft, or 48 ÷ 27 = 1.78 cu yd.
  2. With 10 % extra: 52.8 cu ft = 1.96 cu yd. Ready-mix order: 2 cu yd.
  3. In bags: 52.8 ÷ 0.60 = 88 bags of 80 lb, or 118 bags of 60 lb.

Result: 2 cu yd of ready-mix, or 88 bags of 80 lb.

#4 rebar grid for a 24 × 24 ft slab, by spacing

SpacingBars along the lengthBars across20 ft sticks to buyTotal barWeight
12 in on centre25 × 23.5 ft25 × 23.5 ft681,258 ft841 lb
16 in on centre19 × 23.5 ft19 × 23.5 ft52956 ft639 lb
18 in on centre17 × 23.5 ft17 × 23.5 ft46856 ft572 lb
24 in on centre13 × 23.5 ft13 × 23.5 ft36654 ft437 lb

Bars each way = spaces rounded up + 1, 3 in clear of every edge, laps of 40 bar diameters (20 in) where a run is longer than a stick. #4 bar weighs 0.668 lb per foot (ASTM A615). Spacing and laps are examples: the engineer or your plans set them.

Worked example: a 24 × 24 ft slab, 4 in thick, with a rebar grid

  1. Area: 24 × 24 = 576 sq ft. Perimeter for the forms: 2 × (24 + 24) = 96 ft.
  2. Volume: 576 sq ft × 4 in ÷ 12 = 192.0 cu ft, ÷ 27 = 7.11 cu yd.
  3. With 10 % extra for uneven ground and spillage: 7.82 cu yd. Ready-mix is ordered by the quarter yard: 8 cu yd.
  4. In bags that would be 211.2 cu ft ÷ 0.60 = 352 bags of 80 lb, or ÷ 0.45 = 470 bags of 60 lb, so ready-mix is usually less work on a slab this size.
  5. Rebar at 16 in on centre: 19 bars of 23.5 ft and 19 bars of 23.5 ft, cut from 52 sticks of 20 ft #4, 639 lb of steel.

Result: order 8 cu yd of ready-mix and 52 sticks of #4 rebar.

The whole job, on your phone

SlabCalc: Concrete & Rebar

Slabs, footings, columns and stairs on a feet-inch keypad, with rebar, mesh and forms. Pay once, no ads. See what's inside.

Become a tester, freeiPhone? Sign upClosed test on Google Play · App Store coming soon

Questions

How do I calculate concrete for a slab?

Multiply length × width × thickness, all in feet (4 in is 0.333 ft), to get cubic feet, then divide by 27 for cubic yards. Add 5–10 % for waste.

How many yards of concrete do I need for a 20x20 slab?

4.94 cubic yards at 4 in thick before waste, 5.43 with 10 % extra, so the ready-mix order is 5.5 yards. At 6 in thick it is 8.15 yards with the extra. The table has 30 sizes, and each one loads into the calculator.

How many 80 lb bags of concrete make a yard?

45. An 80 lb bag yields about 0.60 cu ft and a cubic yard is 27 cu ft. It takes 60 bags of 60 lb or 90 bags of 40 lb.

How many square feet does a yard of concrete cover?

81 sq ft at 4 in thick, 65 sq ft at 5 in and 54 sq ft at 6 in: 27 cu ft divided by the thickness in feet.

When should I order ready-mix instead of bags?

Around one cubic yard. Below that a truck is a short load with an extra fee; above it you would be mixing 45 or more 80 lb bags, and ready-mix is usually less work.

How much rebar does a slab need?

Count the bars each way: the spaces rounded up, plus one, kept 3 in clear of the edges. A 20 × 20 ft slab with #4 bar at 16 in on centre takes 32 sticks of 20 ft; at 24 in it takes 22. Bar size and spacing come from your plans or engineer.

How thick should a slab be?

That depends on what it carries and on the ground under it, so take it from your plans, your engineer or the local building department. The calculator and the tables price 4, 5, 6 and 8 in so you can compare.

Does the calculator handle footings, columns and stairs?

This page is for rectangular slabs. The SlabCalc app does footings, pads, columns, sonotubes, post holes, walls and stairs, and adds mesh and forms.