NEC edition by state: which electrical code each state uses
The National Electrical Code edition in force in each of the 50 states and the District of Columbia, the day it took effect and what is being adopted next.
Quick answer: NEC 2023 is the most common statewide edition, in force in 18 states. The others: NEC 2026 in 6, NEC 2020 in 17, NEC 2017 in 3, NEC 2014 in 2. NEC 2026 is in force in Colorado, Maine, Massachusetts, Minnesota, North Dakota and Wyoming. Arizona, Illinois, Kansas, Mississippi and Missouri have no statewide edition that covers houses: there the city or county decides. Counts include the District of Columbia.
NEC edition in force, state by state
The statewide edition is the starting point. Cities and counties may amend it or enforce a newer one, and the inspector has the final word.
| State | NEC edition in force | In force since | Notes |
|---|---|---|---|
| Alabama | NEC 2020 | 1 Jul 2022 | — |
| Alaska | NEC 2020 | 16 Apr 2020 | — |
| Arizona | No statewide edition | — | No statewide code: cities and counties adopt the NEC. |
| Arkansas | NEC 2020 | 1 Aug 2022 | With Arkansas amendments. NEC 2026 is being adopted. |
| California | NEC 2023 | 1 Jan 2026 | As the 2025 California Electrical Code, with state amendments. |
| Colorado | NEC 2026 | 1 Aug 2026 | — |
| Connecticut | NEC 2020 | 1 Oct 2022 | With Connecticut amendments. NEC 2023 is being adopted. |
| Delaware | NEC 2023 | 1 Jan 2026 | — |
| Florida | NEC 2020 | 31 Dec 2023 | NEC 2023 is being adopted. |
| Georgia | NEC 2023 | 1 Jan 2025 | — |
| Hawaii | NEC 2020 | 14 Mar 2023 | — |
| Idaho | NEC 2023 | 1 Jul 2023 | With Idaho amendments. Electrical permits and inspections come from the state (DOPL), not the county. |
| Illinois | No statewide edition | — | The state rule (NEC 2008) covers only commercial work outside cities with their own code. Chicago uses NEC 2017 with its own amendments. |
| Indiana | NEC 2017 | 26 Dec 2019 | Houses: NEC 2017 through the 2018 IRC with Indiana amendments. Commercial: NEC 2008. NEC 2023 is being adopted. |
| Iowa | NEC 2023 | 1 Jul 2025 | With Iowa amendments. NEC 2026 is being adopted. |
| Kansas | No statewide edition | — | The State Fire Marshal rule is NEC 2008; cities and counties adopt their own. |
| Kentucky | NEC 2023 | 1 Jan 2025 | NEC 2026 is being adopted. |
| Louisiana | NEC 2020 | 1 Jan 2023 | — |
| Maine | NEC 2026 | 1 Jul 2026 | With Maine amendments. |
| Maryland | NEC 2020 | 1 Jul 2025 | With Maryland amendments. NEC 2023 is being adopted. |
| Massachusetts | NEC 2026 | 24 Apr 2026 | With Massachusetts amendments. |
| Michigan | NEC 2014 | 8 Feb 2016 | One- and two-family houses. Commercial work: NEC 2023. NEC 2026 is being adopted for commercial work. |
| Minnesota | NEC 2026 | 17 Aug 2026 | — |
| Mississippi | No statewide edition | — | No statewide code: cities and counties adopt the NEC. |
| Missouri | No statewide edition | — | No statewide code: cities and counties adopt the NEC. |
| Montana | NEC 2020 | 10 Jun 2022 | With Montana amendments. NEC 2023 was expected from September 2026: check. |
| Nebraska | NEC 2023 | 1 Aug 2024 | NEC 2026 is being adopted. |
| Nevada | NEC 2017 | 1 Jul 2018 | The state rule covers state work; cities and counties usually adopt a newer NEC. |
| New Hampshire | NEC 2023 | 1 Jul 2025 | With New Hampshire amendments. |
| New Jersey | NEC 2020 | 6 Sep 2022 | With New Jersey amendments. |
| New Mexico | NEC 2020 | 28 Mar 2023 | — |
| New York | NEC 2023 | 31 Dec 2025 | New York City: NEC 2020 with city amendments. |
| North Carolina | NEC 2020 | 1 Nov 2021 | With North Carolina amendments. NFPA lists this edition for other than one- and two-family dwellings. |
| North Dakota | NEC 2026 | 1 Jul 2026 | — |
| Ohio | NEC 2023 | 15 Apr 2024 | Houses: with Ohio amendments. |
| Oklahoma | NEC 2023 | 14 Sep 2024 | — |
| Oregon | NEC 2023 | 1 Oct 2023 | With Oregon amendments. NEC 2026 was expected from 1 Oct 2026: check. |
| Pennsylvania | NEC 2020 | 1 Jan 2026 | — |
| Rhode Island | NEC 2023 | 1 Dec 2025 | — |
| South Carolina | NEC 2020 | 1 Jan 2023 | With South Carolina amendments. NEC 2023 from 1 Jan 2027. |
| South Dakota | NEC 2023 | 12 Nov 2024 | With South Dakota amendments. |
| Tennessee | NEC 2017 | 1 Oct 2018 | With Tennessee amendments. |
| Texas | NEC 2023 | 1 Sep 2023 | — |
| Utah | NEC 2023 | 1 Jan 2025 | — |
| Vermont | NEC 2020 | 1 Jan 2023 | NEC 2023 is being adopted. |
| Virginia | NEC 2020 | 18 Jan 2024 | NEC 2023 is being adopted. |
| Washington | NEC 2023 | 1 Apr 2024 | NEC 2026 is expected from 31 Dec 2026. |
| West Virginia | NEC 2020 | 1 Aug 2022 | With West Virginia amendments. |
| Wisconsin | NEC 2023 | 1 Sep 2026 | Adopted for 1 Sep 2026; before that NEC 2017. |
| Wyoming | NEC 2026 | 1 Jul 2026 | — |
| District of Columbia | NEC 2014 | 29 May 2020 | Through the 2017 DC Construction Codes; an update is in rulemaking. |
| Puerto Rico | Not confirmed | — | We could not confirm the edition from an official source. Ask the permit office (OGPe). |
A link to one state ends with its two-letter code, for example #tx for Texas. “No statewide edition” means the state leaves the choice to cities and counties, or its own rule does not cover houses.
States where a newer edition is on the way
Arkansas, Connecticut, Florida, Indiana, Iowa, Kentucky, Maryland, Michigan, Montana, Nebraska, Oregon, South Carolina, Vermont, Virginia and Washington. The note in each row says which edition and, where the state has set one, the date.
Why the edition matters
An inspector checks the work against the edition the jurisdiction adopted, not the newest one. Article numbers and requirements move between editions, so a rule quoted from NEC 2023 may read differently, or sit in another section, where NEC 2017 or 2020 is still in force. Before a job in another state, look up its edition first.
https://zhukovskyi.space/calculators/electrical/nec-edition-by-state.html · checked 16 November 2026
May a homeowner do their own electrical work?
Read from each state's statute or licensing board on 16 November 2026, for the 19 states we have checked so far. A permit and an inspection are still required almost everywhere. States not listed here have not been checked: ask the local building department.
| State | May the owner wire their own house? | The state's conditions | Source |
|---|---|---|---|
| Arizona | Yes | Only you will live there, not for sale or rent; a sale or rental within a year counts as for sale. | azleg.gov |
| California | Yes | You do the work yourself and the house is not built to sell; a sale within a year counts as built to sell. | cslb.ca.gov |
| Colorado | Yes | Your own home, with the state permit and inspection. | leg.colorado.gov |
| Florida | Yes | Your own home, not for sale or lease. You sign the permit and supervise all the work; a sale within a year counts as built to sell. | leg.state.fl.us |
| Georgia | Yes | A home you own or live in, with the local permit and inspections. | gov.georgia.gov |
| Idaho | Yes | Your primary or secondary home and its outbuildings, not commercial or rented; you do the work yourself. | legislature.idaho.gov |
| Michigan | Yes | A one-family home you own and live in, or will live in, and its outbuildings. | michigan.gov |
| Minnesota | Yes | A one-family home you own and live in, or will once it is built; you do all the work yourself. | dli.mn.gov |
| New Jersey | Yes | You or your immediate family must live in the house now; not rentals. | nj.gov |
| New York | Decided by the city or county | Ask the local building department. | dos.ny.gov |
| North Carolina | Yes | Your own property for your own use, not meant for rent, lease or sale. | ncbeec.org |
| Ohio | Decided by the city or county | Ask the local building department. | com.ohio.gov |
| Oregon | Yes | Your own house or your immediate family’s, not for sale, exchange, lease or rent. | oregon.gov |
| Pennsylvania | Decided by the city or county | Ask the local building department. | pa.gov |
| Tennessee | Yes | A single house for your own use, not for resale, lease or rent. Some cities add their own rules. | tn.gov |
| Texas | Yes | Only in a house you own and live in. Your city may still require a permit. | tdlr.texas.gov |
| Virginia | Yes | Your own primary home for your own use, no more than one house in 24 months. | law.lis.virginia.gov |
| Washington | Yes | Your own property, unless it is a new building for sale or rent, or you sell within 12 months. | app.leg.wa.gov |
| Wisconsin | Yes | A house you own and live in, unless a local ordinance requires a license. | docs.legis.wisconsin.gov |
Electrician Calc: Wire & Panel
Wire size with derating, panel planner, motors, solar and 21 calculators with step-by-step working and PDF reports. See what's inside.
Questions
Which states use the 2026 NEC?
Colorado, Maine, Massachusetts, Minnesota, North Dakota and Wyoming, as of 17 November 2026. NFPA's own table is dated 3 August 2026, so a state that switched after that day may still show its older edition here.
Which states have no statewide electrical code?
Arizona, Illinois, Kansas, Mississippi and Missouri. In Arizona, Mississippi and Missouri the NEC is adopted city by city or county by county. Illinois and Kansas have a state rule based on NEC 2008, but it does not cover houses in places with their own code, so the local edition is the one that counts.
Which NEC edition do most states use?
NEC 2023: 18 states enforce it statewide. NEC 2026: 6. NEC 2020: 17. NEC 2017: 3. NEC 2014: 2.
Is the NEC a federal law?
No. The National Electrical Code is a model code published by NFPA as NFPA 70. It becomes law only where a state, county or city adopts an edition, often with its own amendments.
How often is the NEC updated?
Every three years: 2017, 2020, 2023, 2026. States adopt each edition on their own schedule, which is why several editions are in force at the same time.
How do I find the edition my city enforces?
Ask the building department that issues the electrical permit, or read its permit page. A city may amend the state's edition or enforce a newer one, and the inspector's edition is the one your work is checked against.
Which edition do the calculators on this site use?
NFPA 70, National Electrical Code, 2023 edition: Table 310.16 for ampacity, Table 250.122 for grounding and Chapter 9 for conduit fill. If your state is on another edition, check the article numbers against that edition.
Reference only. The code edition and amendments adopted where you work, the equipment's listing and the manufacturer's instructions govern. Have a licensed electrician check the installation.